Davis Vantage™ Hardware
Station Hardware:Davis Vantage Vue
Additional:Rain Single Spoon(0.1in)
Installed Since:January 2019
Davis Vantage Vue
Davis® Vantage™ Information.
Davis® Information.
Meteobridge
Interface:Meteobridge Pro DIR-505
Interface Uptime :1 Day 19 hrs 4 mins
Firmware:4.4-13625
Meteobridge Pro
NANOSD Information.
Meteobridge Information.
Hardware Power
    Console Power
   No Power !!
Check Power
         ISS Power
Good
Condition
Source is a 120/240V AC TO 5V DC.
ISS solar charged 3V CR123 Lithium.